B
Principal Mechanical Engineer
Blue Energy
On-siteEngineering
From the original posting
DC - Chevy Chase, MD COMPANY OVERVIEW Blue Energy is transforming how nuclear power gets built. Instead of constructing each plant on-site from scratch - a process that takes 10-15 years and is too expensive and unpredictable to finance - we build our plants like ships: in a factory, on an assembly line, then transport and assemble them at the site. This cuts costs by over 60% and brings plants online in just three years. We also pair natural gas with nuclear at our sites, so customers can start receiving power from gas turbines right away and then switch over to clean nuclear power once it…
Excerpt from the original posting (English). Full details are on the employer site.m3rad Jobs does not hire and does not represent the employer. The original posting is the reference.